My name is Davide Ramponi, I am 20 years old and currently training as a shipping agent in Hamburg. In my blog, I take you with me on my journey into the exciting world of shipping. I share my knowledge, my experiences, and my progress on the way to becoming an expert in the field of Sale and Purchase – the trade with ships.

Newbuildings are always ambitious projects. But when a shipowner decides to invest in cutting-edge technology, alternative fuels, and a tailor-made vessel design—all in one ship—the financing becomes just as complex as the construction.
In today’s post, I want to share a real-life success story that shows what’s possible when a bank, a shipowner, and a shipyard work together toward a common vision. This case study highlights not only the challenges that can arise when financing next-generation ships, but also the solutions that helped turn this project into a milestone in sustainable shipping.
Whether you're a shipowner planning a newbuild, a broker navigating financing options, or a banker evaluating green maritime loans—this story has key takeaways for you.
The Project: Financing a Dual-Fuel, Custom-Designed Tanker
The project involved a Northern European shipping company with a strong track record in the product tanker segment. Looking ahead, the company wanted to expand its fleet with a dual-fuel, methanol-ready MR tanker that would not only meet upcoming IMO environmental regulations, but also give them a competitive edge in charter markets focused on sustainability.
What made this newbuild different?
Dual-fuel propulsion (methanol and conventional marine fuel)
Energy-saving devices (optimized propeller, air lubrication system)
Advanced digital monitoring systems
Custom cargo configuration to serve niche chemical trade routes
The cost: €65 million.
The Financing Challenge: High Complexity, High Risk
From a financing perspective, this project came with multiple red flags:
1. Unproven Fuel Technology
Methanol-capable engines were still new and carried performance risks.
2. Longer Construction Timeline
The complexity of the design required 30+ months of construction.
3. Custom Design = Lower Resale Value
f the owner defaulted, the bank would have limited options to resell the vessel.
4. Supply Chain Volatility
Equipment (especially for green tech) had longer lead times and unpredictable pricing.
In short: this was not a standard ship—and not a standard loan.
The Solution: A Tailored, Multiphase Financing Package
To make the deal viable, the shipping company worked with an experienced maritime finance team at a Scandinavian bank. Instead of relying on a one-size-fits-all approach, the bank structured a custom loan package with built-in flexibility, risk-sharing, and performance incentives.
Here’s how they did it:
1. Split Financing Structure
The bank broke the financing into three phases:
Phase 1: Pre-delivery finance (20%)
Covered shipyard down payments and early-stage equipment orders.
Phase 2: Construction-stage drawdowns (60%)
Tied to clearly defined milestones: keel laying, engine installation, launch, sea trials.
Phase 3: Post-delivery finance (20%)
Contingent on passing final sea trials and third-party technical audit.
This structure protected the bank and ensured progress accountability.
2. Sustainability-Linked Terms
The loan included performance-based pricing:
If the vessel achieved its CII (Carbon Intensity Indicator) targets within the first two years, the interest rate was reduced by 25 basis points.
If it exceeded fuel consumption benchmarks, a small penalty margin was applied.
This approach incentivised environmental performance and aligned interests.
3. Risk-Sharing with Public Institutions
To manage the project's technological risk, the bank partnered with:
Export Credit Agency (ECA) from the shipyard’s country
A European Union maritime green innovation grant
These institutions covered 40% of the project’s risk through loan guarantees and subsidie*, making the financing much more palatable.
4. Third-Party Oversight
The financing contract required:
Regular site inspections by a marine surveyor
Independent reviews of sustainability KPIs
A ship finance advisor acting as a liaison between bank and owner
This gave the bank real-time insight—and prevented surprises.
The Outcome: Delivery on Time, On Budget—and a Charter in Place
Despite early doubts, the project was a success. Here’s what happened:
The vessel was delivered three weeks ahead of schedule.
Sea trials exceeded efficiency targets, with 15% lower fuel consumption than baseline.
A long-term charter agreement was signed with a major Scandinavian energy company six months before delivery.
The shipowner activated the interest reduction clause in year two.
The bank reported a strong ESG performance boost across its maritime portfolio.
Everyone walked away satisfied—and already discussing financing for a sister vessel.
Lessons Learned: What This Case Teaches Banks, Shipowners & Brokers
This case offers valuable insights for everyone involved in financing modern newbuilds. Let’s break it down:
For Banks: Be Flexible, But Stay Structured
- Standard loans won’t fit custom green projects.
Milestone-based disbursements protect capital while maintaining trust.
Sustainability-linked pricing is a win-win—driving ESG performance and aligning incentives.
Pro tip: Partner with ECAs, green funds, and public institutions to offset technical risk.
For Shipowners: Preparation Is Power
Banks are more open to funding complex builds when specs are clear and risks are addressed early.
Third-party technical audits, supply chain contingencies, and a strong business case make financing smoother.
Showing pre-charter interest improves bank confidence.
Pro tip: Combine your ship financing strategy with ESG positioning and lifecycle performance planning.
For Brokers: Your Role Is More Strategic Than Ever
As a broker, you’re not just matching buyers and sellers—you’re a bridge between vision and financing.
Helping clients structure their proposals, identify funding partners, and communicate risk clearly is key.
You can add real value by connecting shipowners with green financing programs and advising on milestone planning.
Pro tip: Build relationships with ESG-aware banks, surveyors, and legal advisors—then become the coordinator that brings them all together.
Conclusion: Collaboration Makes Complex Projects Work
Modern shipbuilding is evolving fast—and financing must evolve with it. This case study shows that complex doesn’t mean impossible. With smart planning, open collaboration, and the right financial architecture, even the most advanced green newbuilds can become profitable realities.
✅ Banks can support innovation without sacrificing risk management.
✅ Shipowners can build future-proof vessels without overspending.
✅ Brokers can play a central role in bringing ambitious visions to life.
Have you worked on a complex financing deal—or are you planning one now? What strategies have you seen work (or fail) when banks get involved?
Share your experience and thoughts in the comments—I look forward to the exchange!




Kommentare